Monday, 21 November 2011

November 18, 2011

The guys were back from the hunt camp.  Jon reports that the hunting was a bust, but the camaraderie was a success. 

This week they succeeded in getting most of the porch roof framed.

The roofers were scheduled to start shingling the roof this week with weather conditions including four inches of snow on Thursday prevented them from starting.  A wet plywood gives a poorer roof.

Don is making good progress on getting the stone installed on the deck wall.


Finally the fireplace was installed on Friday.  It still requires the insulated chimney to be added (they were send a damaged elbow and had to get a replacement) the fireplace walls still have to be framed in, and the stone facing installed, but combined with the in-floor heating tubing last week the cottage is getting closer to being winterized. (pardon the bad focus on the last photo)


Overall things are progressing as scheduled