The main roof is now shingled, so that as soon as the windows arrive and are installed within the next week or so, the cottage will be water tight. It was decided to hold off shingling the porch roof to allow us to use that roof to stage our scaffolds to install the siding (which will be on site in about a week)
The boat port was also reshingled to match the cottage.
The fireplace is now installed and the chimney framed in. The fireplace could theroretically be lit
The stone mason has completed the deck wall and can be seen installing the lath on the cottage wall in preperation to installing the stone on the front and side walls.
Finally the interior partitions are all going up and are now defining the interior space of the cottage.
To paraphrase a famous politicain 'the cottage is evolving as it should"