As can be noted the entire 2nd floor has been framed including all the interior partitions. A crane was being used to raise the large trusses into place.
One of the attic truss being lifted over the trees
The north wall is now closed in
Next week everything gets anchored down and the guys will begin installing the roof plywood.
No comments:
Post a Comment